Step 1: Basic Design
- Reducing wastewater flows, e.g. by separation of rain water or by avoiding of sewer infiltration;
- Correct plant dimensioning, particularly avoidance of over-sizing;
- Selection of energy-efficient treatment processes.
Step 2: Detailed Design
- Selection of energy-efficient equipment;
- Use of correctly sized and energy-efficient drives and motors;
- Implementation of control systems matching supply and demand;
- Good thermal insulation where heating energy is externally supplied.
Step 3: Integral Energy Management
- Use of the entire digester gas for power-heat-cogeneration (PHC);
- Use of surplus anaerobic digester capacity for additional gas generation from imported organic waste;
- Efficient use of heat, e.g. recovery from processes or wastewater effluent;
- On-site sludge drying and incineration with energy recovery and reuse;
- Use of natural gas in PHC systems where heat is in short supply;
- Use of renewable energy, e.g. wastewater heat, wind or solar energy.
Solution Finderclose
Keywords of this page
step,
separation,
sludge,
energy,
wwt,
anaerobic,
digester,
equipment,
incineration,
infiltration,
recovery,
reuse,
sewer,
waste,
wastewater,
effluent,
heat